2009-10

When viewing the full size images use the BACK button on the toolbar to return here.

Plenty of tweaking and refinements still to play with.

A new March May pump is now installed to deal with wort transfer and recirculation.
New SS quick disconnects also used together with silicone hose.

 

March 2009 - at last!

New control panel for the HERMS and HLT

Digital timer control, Pump speed control, PIDs for each temperature control plus AUTO and MANUAL indicators and switches.

panel2-close

Bottom of panel has two 16A sockets to connect the heater and pump.
Also has the two sockets for the thermocouple leads.

Circuit 1 - immersion heater for HLT
Circuit 2 - pump control for HERMS.

Click here for the
wiring circuit diagram

panel2-inside

Maxicool 100 flash chiller is now in action and can either be connected to a cooling coil around the outside of the fermenter when brewing in the warm summer months or to a similar cooling coil in the second kegerator.
This cabinet is lined with 50mm Kingspan panels and the coil fits around one of the cornies. It provides extra cooling for the beer with the cool!!

5ales